Usage---Chicken house
laying hen ,broiler chicken
hot sale steel structure broiler breeder chicken poultry breeding houses
We are the professional supplier who manufactures prefabricated automatic poultry house, use the galvanized steel structure for the frame so that the appearance will not be rusty .Chicken house inside the spacious and bright side of the chicken house installed on the side of the fan house ventilation effect. poultry house use color steel sandwich panel wall to maintenance, so the insulation, noise, fire performance is good,
We can provide purchasing services to save your time and money .
Features --- Chicken House
1. Cheap cost
2. Convenient and fast installation
3. High strength with reasonable design, it has long service life
4. Good heat preservation
Our advantage:
Area advantage for steel materials
China, which produces over half of the world ' s steel. And Hebei steel output rank first in china for many years.
Rich experience
We have been working on steel frame building constructions for more than 10years. We have build many different constructions for various industries, such as Metallurgical industry, Chemical industry, Machinery manufacturing, Electronics industry and so on.
The Most Considerate Service
we have professional and experienced design engineers . All you need to do is telling us your demand details.
If you worried about the installation, no problem! We have the service of installation, supervision and training. We can send our engineers to guide the installation on site
Technical Parameters
Name
|
Steel Structure Chicken House
|
Material
|
Q235B,Q345B
|
Main frame
|
Welded H-shape steel
|
Purlin
|
C,Z-shapesteel purlin
|
Roof and wall
|
a) Rock Wool Sandwich Panels;
b) EPS Sandwich Panels;
c) Glass wool Sandwich Panels;
|
Door
|
a) Rolling Gate;
b) Sliding door;
|
Window
|
PVC Steel or Aluminum Alloy
|
Down spout
|
Round pvc pipe
|
1>. Professional
we have been a professional manufacturer of steel structure building,container house,prefabricated house ,sandwich panel and color steel sheet with ISO9001 certification.
2>. Quality Management
Quality control and stability: Applied with high quality, each product is produced under strict quality control at every manufacturing process from raw materials to final testing which ensures our products come with perfect performance.
3>. Excellent after-sales service
Our customer service team offers you Pre-sales and after-sales service.
4>. OEM/ODM available:
1). Customized design;
2). Customized dimension;
3). Customized brand package.
-Professional design and engineering team: Full solution for steel structure design.
-Procurement and Manufacture for all material for prefabricated building.
We have a professionalprocurement team to make sure all the materials are with good quality.
-Site management & Installation supervision, We could send our engineers to help for the installation supervision, you just need to prepare a team which know normal construction works will be OK.
1.Common type of the industrial building?
Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients’ request.
2.What’s the quality grade of the steel structure components?
Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure.
3.How about the delivery time?
Reply: Usually,within 45-60 days after the order confirmed, also depends on the fabrication quantity.
4.How about the derust grade?
Reply: Ball blasting Sa 2.5 on main steel structure ; manual derust St2.0 on secondary steel structure.
5.What kind panel used for the roof and wall?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS,glass wool,rockwool and PU.
6.How to install it?
Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if needed.
7.Maintenance:
Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months.So the surface will stay more time.