E-mail: steel-structure@sanhecg.com Tel : +86-311-89607789
Company news
News Your location: Home >> News >> Company news

Steel structure warehouse installation


Steel structure warehouse installation to be followed in general seven measures and points:
1. Steel structure warehouse should be divided into one or several inspection lots according to deformation joint or space stiffness unit before installation.
2. Installation of steel warehouse inspection and acceptance in the field of acceptance and welding acceptance, fastener connections, installation and other sub-projects after acceptance based on acceptance.
3. Steel warehouse installation of the measurement correction, high-strength bolt installation, negative temperature welding process. Should be carried out before the installation process test or assessment. And should be based on the development of the corresponding special construction process or program.
4. Steel structure warehouse installation deviation detection, the need to structure the formation of spatial stiffness connected to the unit after the fixed.
5. Steel structure warehouse installation, you must control the roof, floor, platform and other construction load.
6. After the formation of space stiffness unit. Should be timely on the column floor and the foundation of the top of the gap for watering fine stone concrete, grouting materials and other materials.

7. Crane beam or directly under the dynamic load of the beam tensile flange, crane frame or directly bear the dynamic load analysis of its tensile string on the welding rod shall not hanging objects and fixtures.

search keywords:steel structure warehouse

Recommended products MORE+
OUR PRODUCTS
Copyright © 2015 Shijiazhuang Sanhe Steel Structure Co.,Ltd All Rights Reserved
Online Service×