Preparation of color steel board room before construction
1, before the construction should seriously organize the relevant technology, construction personnel to conduct drawings and technical consultation.
2, see the scene of a three-level situation, a variety of components and plate stacking site should be higher than the road 10cm, to prevent water.
3, according to the actual construction needs of the project, the scene must be connected to 380V and 220V power supply, calculate the need for adequate power lines, make the allocation of power distribution work.
4, to develop the delivery route and materials into the pit after the venue to ensure that the road is smooth, does not affect the construction shall prevail.
5, the civil foundation of the plane size and level of measurement, review, to ensure the smooth construction of the project, if any error, notify the project department to be amended.